| Energy By Choice: WHAT
TO EXPECT
Energy by Choice does all the work
for you
from start to finish!
Prior to entering into a contract, a representative
of Energy by Choice, LTD. will visit your property and evaluate
your potential for taking advantage of the free energy of the
sun. Energy by Choice, LTD. will consider your roof areas,
their slope and orientation to the sun, issues of shading,
the age of your roof, the structural capacity of your roof,
the path the wiring will need to follow to get to the meter,
the voltage, age and location of your electric panel and your
annual electric consumption. We will ask that you provide copies
of at least twelve months of you electric bills. This is the
only real work you will be expected to perform when you select
Energy by Choice.
After the site evaluation, Energy by Choice,
LTD. will prepare a detailed proposal that will include options
of system size, cost, aesthetics and power generating expectations.
We will provide financial analysis to aid your decision making
process. We will meet with you to ensure that you understand
every detail of our proposal. When you elect to hire Energy
by Choice, LTD. a signed contract and a small deposit are
all that it takes to get started. Sit back and enjoy the
attention.
First step will be the submission of the
LIPA Rebate/Preapproval application and Utility Intertie Agreement.
Energy by Choice, LTD will prepare this application for your
signature. Typically this will be done within the same time
period as the building permit process.
Simultaneously Energy by Choice will
meet with the Structural Engineer/Architect on site to determine
the issues and solutions that the Engineer needs to design
and submit to the local building department for a building
permit. Energy by Choice will monitor the engineers activities,
as well as prepare and deliver the building permit application
to the building department. Depending on the local building
department, this whole process should take about four to six
weeks.
Upon pre approval by LIPA and issuance of a building permit,
Energy by Choice will release the order for materials. Depending
on the availability of materials, a delivery will be made
to your address anywhere from two to six weeks after release
of the order for materials. Installation is scheduled as soon
as practical after that and installation will take on average 2-4 days.
Upon completion of the installation, an electrical
inspection is necessary by the Board of Fire Underwriters.
Several days after satisfactory inspection, a certificate will
be issued, which Energy by Choice will forward to LIPA along
with photos, equipment serial numbers, copies of invoices,
drawings, etc. Upon receipt of the acceptable paperwork, LIPA
will schedule a field verification (usually two to three weeks
later) to confirm an acceptable installation, in accordance
with all the paperwork filed. They will also evaluate the systems
ability to produce power and will verify orientation as well
as any shading issues. When LIPA is satisfied that the installation
meets their expectations and technical criteria, they will
change the meter to a “net meter” and you will
be free to make grid connected power and enjoy years of trouble
free electricity production.
LIPA’s policy is to issue the rebate check
within sixty days of accepting the system.

|